Nicola Mining Inc. Enters Into Exploration and Material Purchase Agreement

logo_color_xl_2

October 3, 2016 | News Releases

TSX.V: NIM
NEWS RELEASE

VANCOUVER, B.C., October 3, 2016 – Nicola Mining Inc. (TSXV: NIM) (the “Company”) is pleased to announce that it has entered into an Exploration and Material Purchase Agreement (the “Agreement”) with Teck Highland Valley Copper Partnership (“HVCP”), a wholly owned subsidiary of Teck Resources Limited.

Nicola Mining Inc. owns 100% of the Thule Copper Property (the “Property”) that covers 10,084 hectares along the southern end of the prolific copper-rich Guichon Batholith.  The Property is located approximately 20 kilometres south of the Highland Valley Copper mine, the largest open pit copper mine in Canada which is also located within the Guichon Batholith.

The Company will work with HVCP to conduct an exploration program on the historic stockpiles on the Property in order to gather information regarding the grade and other characteristics of the stockpiled material.   Following the exploration campaigns, HVCP will have the right to purchase stockpile material mined by the Company.  The Company will carry out the exploration and mining program, and HVCP has agreed to reimburse the Company for certain costs related to the exploration and mining programs.

If the mining program proceeds, HVCP will to pay the Company as follows for purchased material:

Copper Price (US$/lb)*

Price per Tonne of Bought Material (C$/Tonne)

< $3.50

$0.40

$3.50-$4.50

$0.60

>$4.50

$0.80

* Average LME copper price for the calendar quarter

HVCP will purchase material on a per tonne basis, as described above.  In addition, it agrees to fund the Company for certain costs associated with reclamation and re-sloping work for areas in which stockpiles have been removed.

About the Property

The historic Craigmont Mine, which is part of the Thule Copper Property, operated as an open-pit mine by Craigmont Mines Ltd. from 1961 to 1967 and as an underground sub-level cave mine from 1967 to 1982 and is located on the southern section of the Property.  The Craigmont Mine produced approximately 34,000,000 metric tonnes of ore averaging 1.28% copper from Body No. 1 and Body No. 2.  Craigmont Mine’s historic cut-off grade was 0.7% Cu.

McElhanney Consulting Services Ltd. of Vancouver BC, an ISO 9001 (2008) certified company, flew a LiDAR and air photo survey covering approximately 108 square km of the Thule property. Using the Leica ALS70 LiDAR unit, data was captured at a ground-sampling distance of four points per metre, providing a highly accurate topographic dataset. High-resolution, 20cm pixel colour orthophoto was created for selected areas of the property.  Stockpiles are estimated to be 80-90 million tonnes.

On September 7, 2016 the Company announced results from its highly successful five-hole drill exploration program which highlighted an intersection of 1.11% copper over 85.92 metres in THU-002, through the Embayment Zone, located approximately 1 km northwest of the past-producing Craigmont Mine.

Results from the drilling program support the Embayment Zone as a fault-offset, westward continuation of the skarn zone that hosts the Craigmont deposit. A follow-up drill program will be designed to determine continuity of mineralization further west along strike and at depth from THU-002.

President and CEO, Peter Espig, commented, “We are very pleased to team with HCVP on this exciting opportunity.  The approximate 88 million tonnes of Stockpiles fed by a known historic cut-off grade of 0.7% Cu could be a mutually beneficial project to both companies by providing additional cash flow through supply of attractive mill feed to HVCP.”

Nicola Mining also announces that it has engaged Mocking Jay Inc. and Gold Stock Trades for investor relations and has issued a total of 175,000 stock options.

Nicola Mining Inc. is a junior mining company listed on the TSX Venture Exchange, and is in the process of recommencing mill feed processing operations at its 100% owned state-of-the-art mill and tailings facility, located near Merritt, British Columbia. It has already signed four mill profit share agreements with high grade gold producers. The fully-permitted mill is able to process both gold and silver mill feed via gravity and floatation processes. The Company also owns 100% of Treasure Mountain, its high grade silver property, and a gravel pit, which is located adjacent to its milling operations.

On behalf of the Board of Directors

Peter Espig

Peter Espig

CEO & Director

For additional information please contact:

Peter Espig
Phone: (604) 647-0142
Email: peter@nicolamining.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

###

Millennial Lithium Files Technical Report on Pastos Grandes

Millennial-Lithium-logo

TSX VENTURE : ML

September 21, 2016

VANCOUVER, BRITISH COLUMBIA–(Sept. 21, 2016) – Millennial Lithium Corp. (TSX VENTURE:ML), (“Millennial” or the “Company“) is pleased to announce the filing on SEDAR of its NI 43-101 compliant Technical Report related to its Pastos Grandes Properties in Salta, Argentina (the “Technical Report”).

The Technical Report is titled “Technical Report on the Pastos Grandes Project, Salta Province, Argentina, Prepared for Millennial Lithium Corp.” and dated September 14, 2016.

The Technical Report references the Pastos Grandes Project which is strategically located within the Argentine portion of the “Lithium Triangle”, which is host to some of the world’s largest lithium resources. The Project is approximately 1200 hectares in size and ideally situated in the center of the Pastos Grandes Salar in Salta, Argentina.

Previous work identified in the report indicates the Pastos Grandes Salar exhibits significant lithium and potassium brines. The report presents information on historical exploration results including surface geochemical sampling, Magnetolluric (MT) surveying, CSAMT, vertical electrical sounding (VES) geophysical surveying and 4 pumping wells testing and measuring brine flows in aquifers in the salar.

This news release has been reviewed by Brent Butler, director, qualified person as that term is defined in National Instrument 43-101.

MILLENNIAL LITHIUM CORP.

Graham Harris

Chairman

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

This news release may contain certain “Forward-Looking Statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 an applicable Canadian securities laws. When used in this news release, the words “anticipate”, “believe”, “estimate”, “expect”, “target, “plan”, “forecast”, “may”, “schedule” and similar words or expressions identify forward-looking statements or information. These forward-looking statements or information may relate to future prices of commodities, accuracy of mineral or resource exploration activity, reserves or resources, regulatory or government requirements or approvals, the reliability of third party information, continued access to mineral properties or infrastructure, currency risks including the exchange rate of USD$ for Cdn$, fluctuations in the market for lithium, changes in exploration costs and government royalties or taxes in Argentina and other factors or information. Such statements represent the Company’s current views with respect to future events and are necessarily based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social risks, contingencies and uncertainties. Many factors, both known and unknown, could cause results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements. The Company does not intend, and does not assume any obligation, to update these forward-looking statements or information to reflect changes in assumptions or changes in circumstances or any other events affections such statements and information other than as required by applicable laws, rules and regulations.